Title
A resolution setting Monday, February 10, 2025, at 5:00 p.m., as the date for a hearing by the Hearing Examiner to consider Local Improvement District No. 8668, for placement of asphalt street pavement with a structural section, concrete curbs, gutters, surface water mains, and catch basins; and placement of asphalt alley pavement with a structural section, surface water mains, and catch basins, at the following locations:
• Segment No. 1 - Wapato Street from South 66th Street to South 68th Street;
• Segment No. 2 - North 27th Street from Carr Street west to the dead end;
• Segment No. 3 - The alley between Bell Street and Pacific Avenue from
South 43rd Street to South 45th Street.
[Ralph Rodriguez, LID Administrator; Ramiro A. Chavez, P.E. PgMP, Director/City Engineer, Public Works]