Title
A resolution authorizing the execution of an amendment to the Interlocal Agreement
with the Washington State Department of Transportation, increasing the amount by $638,413, for a total of $1,269,735; accepting and depositing said sum into the Transportation Capital Fund, for design changes to the roadway geometrics to reconfigure the directional pedestrian ramps, increase the pavement restoration area
of the intersection, upgrade and add crossing signals, and replace damaged signal
poles along South 56th Street and Tacoma Mall Boulevard at the I-5 Interchange.
[Jon Kulju, Project Manager; Kurtis D. Kingsolver, P.E., Director, Public Works]